Cost contingency

Results: 65



#Item
51Project management / Actuarial science / Risk management / Costs / Cost overrun / Cost–benefit analysis / Uncertainty / Identifying and Managing Project Risk / Cost contingency / Management / Ethics / Risk

SGC Page 1 of 3 Sponsored by Roads & Bridges magazine (RB)

Add to Reading List

Source URL: www.wsdot.wa.gov

Language: English - Date: 2014-08-31 07:01:47
52Business / Statistics / Actuarial science / Risk / Econometrics / Cost contingency / Risk management / Schedule / Total cost management / Management / Project management / Cost engineering

41R-08: Risk Analysis and Contingency Determination Using Range Estimating

Add to Reading List

Source URL: www.wsdot.wa.gov

Language: English - Date: 2014-08-31 06:22:06
53Allowance / Cost overrun / Software development process / Budget / Science / Business / Real estate / Construction bidding / Cost contingency / Construction / Contract law / Project management

OGS Design Procedures Manual A Guide for Designing Projects for Office of General Services Chapter 6 COST CONTROL A.

Add to Reading List

Source URL: ogs.ny.gov

Language: English - Date: 2011-10-18 11:20:28
54Capital cost / Construction / Contingency / Infrastructure

Capital Cost Schematic Design Estimate:

Add to Reading List

Source URL: mentalhealth.vermont.gov

Language: English - Date: 2011-05-08 22:58:07
55Real estate / Cost overrun / Costs / Construction management / Project management / Design–build / Cost contingency / Construction / Architecture / Building engineering

Predesign Manual-Appendix E Guidelines for Preparing Capital Project Cost Estimates

Add to Reading List

Source URL: www.ofm.wa.gov

Language: English - Date: 2014-07-18 19:29:46
56Space / IceCube Neutrino Observatory / Antarctic Muon And Neutrino Detector Array / Neutrino detector / Geostationary Operational Environmental Satellite / Earned value management / Contingency / Data acquisition / Cost overrun / Neutrino astronomy / Physics / Astronomy

IceCube Project Monthly Report - July 2008 Accomplishments • The Integrated Master Schedule is currently being revised based upon RPSC support, flight changes and station opening constraints. Currently, Drilling begins

Add to Reading List

Source URL: icecube.wisc.edu

Language: English - Date: 2011-08-11 16:37:45
57Technology / Business / IceCube Neutrino Observatory / University of Wisconsin–Madison / Antarctic Muon And Neutrino Detector Array / Earned value management / Neutrino detector / Budgeted cost of work performed / Contingency / Neutrino astronomy / Physics / Project management

IceCube Project Monthly Report May 2007 Accomplishments  The National Science Foundation annual review of the IceCube Project was held on

Add to Reading List

Source URL: icecube.wisc.edu

Language: English - Date: 2011-08-11 16:37:45
58Construction / Budget / Business / Management / Cost contingency / Microeconomics / Software development effort estimation / Cost overrun / Costs / Project management

PROJECT COST ESTIMATING GUIDELINES Version[removed]September 30, 2013  Ministry of Transportation and Infrastructure

Add to Reading List

Source URL: www.th.gov.bc.ca

Language: English - Date: 2013-12-09 14:43:47
59Transportation in the United States / Project management / Management / Technology / Cost overrun / Cost contingency / Construction / Estimation / Cost–benefit analysis / Cost engineering / Costs / Business

Inflation Estimation Models: Synthesis

Add to Reading List

Source URL: www.wsdot.wa.gov

Language: English - Date: 2014-08-18 01:56:24
60US Airways / Airport / Low-cost airlines / Southwest Airlines / Aviation / Star Alliance / Transport

Billing Code No[removed]9X U.S. DEPARTMENT OF TRANSPORTATION Office of the Secretary Docket No. DOT-OST[removed]Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of Transportation for Ap

Add to Reading List

Source URL: www.dot.gov

Language: English - Date: 2013-12-12 17:05:45
UPDATE